October 7

KeriKeri

This 60m x 40m existing arena required resurfacing with the current top layer falling way under acceptable standards and the clients expectations.

We were called in to remedy the problem and salvage as much material as possible to keep costs to a minimum.

  • slide 1
  • slide 1
Your browser is out-of-date!

Update your browser to view this website correctly. Update my browser now

×